We work with builders, remodelers and homeowners building their own house. At the rough-in stage we run the trunk line and branches to every planned gas point: range, water heater, dryer, fireplace, lanterns, outdoor kitchen, pool heater and generator. Everything is pressure-tested and inspected before the walls close.
At trim-out we come back for the final connections, regulators and appliance start-up. Plans change on job sites; we size the system with room to add a load later without redoing the trunk.
What we install
- Rough-in gas piping for new homes and additions
- Underground service lines and meter or tank connection
- Manifold systems with CSST or black iron
- Stub-outs for ranges, dryers, fireplaces, lanterns and outdoor kitchens
- Pressure testing and inspection coordination
- Trim-out and final appliance connections